Lake Boren Master Plan Implementation (P-022)

A subset of projects from the Master Plan is currently in the design phase. For the complete 2016 Lake Boren Park Master Plan Update, visit the Master Plan webpage

Consultant: Berger Partnership

30% Design

Proposed improvements for a portion of the park are designed to the 30% level. This provides base information for this portion of the park including survey, tree inventory, wetland / stream delineation, geotechnical report, identification of potential mitigation areas, and permitting memorandum. This initial design work, to the 30% level, establishes the basis for future design phases. 

30% Design Area
30% Design area. (The base graphic is from the 2016 Master Plan. See 30% design submittal drawings link below for the most up-to-date design.) 

Subproject area to be designed to 100%

A limited subproject area is selected to be developed to the 100% level, which includes construction drawings. Improvements in the subproject area include an elevated boardwalk, connecting paths and improvements to the beach. These projects were selected in order to meet high priorities established by the Master Plan: 

Expand the park by providing connectivity between the main body of the park, the newly acquired areas, and the existing and proposed amenities on the eastern shores of the lake.
Provide new experiences in the park, including the opportunities to explore wooded and wetland natural areas. 
Provide greater connection to the lake by providing these new experiences, connections and views.

100% Design Area
Subproject area, 100% Design area. (The base graphic is from the 2016 Master Plan. See 30% design submittal drawings link below for the most up-to-date design.) 

Design for this subproject area is scheduled for completion by the end of 2018 or beginning of 2019. This project will then be ready for construction once funding is available. In 2018, City staff will submit a grant application that, if awarded, will partially fund this project. The Recreation and Conservation Office (RCO) will award the Washington Wildlife and Recreation Program (WWRP) Local Parks category grants in July, 2019.

30% Design was submitted to the City in February 2018. The design team is currently proceeding with design for just for the subproject area to 100%. The design process for the remainder of the 30% design area is on hold, to be resumed under a future design contract. 

Review the 30% design submittal (February 2018):

30% Design Submittal Memo (PDF, 0.2 MB)

30% Design Drawings (PDF, 34.5 MB)

30% Cost Estimate for Subproject Area (PDF,  54 KB)

30% Progress Support Documents including survey, tree inventory, wetland / stream delineation, geotechnical report, identification of potential mitigation areas, and permitting memorandum (PDF, 10.5 MB)